Zhengzhou Freeway Project Progress Photo’s from Gernot Komar

Segmental Bridge Zhengzhou Freeway Construction

Zhengzhou Freeway Project pictures from Gernot Komar on the freeway construction in China. The Precast Segmental units are shown in the casting yard and being placed in on a Pier section in Balanced Cantilever method. The Pier section shows double sections for freeway lanes and the single section units are for ramp construction. Gernot’s company SETI(SUNENGTECH.com). For more information contact us at PETutors . Freeways consist of a 100 km bridge and 100 km of ramps both are precast prestressed segmental construction. These structure types are cost effective is span ranges from 200 to 500 feet making these types of bridges very useful in locations of environmentally sensitive areas minimizing the ground disturbance and utilizing top down construction method.

Gernot Supervising Segment installation
Gernot Supervising Segment installation
Precast Casting Yard
Precast Casting Yard
Precast Crane for Pier Section
Precast Crane for Pier Section
Segment Construction Sequencing
Pier Segment Construction
Balanced Cantilever Construction
Precast Segmental Construction
Balanced Cantilever Construction and Falsework
Balanced Cantilever Construction and Falsework
Balanced Cantilever on the left and on falsework on the right
Balanced Cantilever on the left and on falsework on the right

 

 